Search This Blog

Saturday, November 7, 2009

Operation "Free the Cleco's" ( Left Leading Edge final assembly)

Bekah and I spent a few hours saturday morning trying to liberate clecos so that I had enough to work through both tanks.  I figure the left leading edge was a good place to get some from.  I won't do the right leading  edge for a while since I think I have enough clecos now to work through the tanks.



I also took the time to drop a few rivets into the countersunk spar flange under the tank.  These single rivet holes at the end of the ribs don't get used to hold the skin on so I was able to close them up now with a rivet.



Friday, November 6, 2009

Leading Edge Final Assembly

Trying to liberate a few extra cleco's for the tank assembly, I figured it was time to assemble at least the left leading edge.  It was already drilled when in assembly, so I had to debur sides and holes, as well as dimple and prime.  This all went rather quick except for forgetting to bend the edges in prior to dimpling. . . . . . .   Where the edges of the skin touch the spar; if you don't bend them in, they tend to stand off abit when final riveted.  I was able to use hand seamers and gently bend the edges in after dimpling and think it will turn out OK when final assembled.  Next time I won't make this bonehead mistake..

Also, for primer I used rattle can self etching on the skin.  Just scotchbriting the area where the ribs touch the skin and leaving the alclad clean and shiny everywhere else, I cleaned and prepped with acetone and primed away.   Spraying heavier where the ribs touch the skin and just a light spray over the center alclad skin.  The alclad has some corosion preventative properties on its own, with a thin film of primer of it, we should have no corrosion here.

Below is a pic of the deburred, dimpled and cleaned up ribs ready to go onto the primed leading edge skin.  Tomorow I talk Rebekah into some Riveting Action !


Goodies from Van's !

I received some goodies from Van's pictured here.  It's a bummer getting all these items along the way, then waiting for weeks/months before you get to put them on the plane.   You really can't imagine how much work goes into building a plane.  I never would have imagined.   Every piece of metal, every hole, every thing you look at you have to touch 5, 6, maybe even 7 or 12 times.   It's insane actually..   Also, you never know if it is good enough..  What is good enough?  Perfection?  Well that is un attainable so then we are back to wondering what is good enough.  Then once you are in a place like where I am now (and it only gets worse) where you can go in 1 of 20 directions, what do you do next..  OK, so I am stressed right now about this.. So back to my goodies..

These are very cool items and I just can't wait until I get to work with them.
  • 1 Flop Tube for the left tank..  (Aerobatic Fuel Pick Up)
  • 1 Standard Fuel Pick up  for the right tank(could have made one but wanted to see what van offered for 15 bucks)
  • 2 Deluxe Locking Fuel Caps.  (Awesome ! Very nicely machined.  Hope rain water doesn't penetrate these guys to much)
  • 1 Quart Fuel tank sealant / Extra sealant tube
  • 1 Sealant gun. (looks like a pretty expensive caulking gun to me.  I bet you could use a regular caulking gun)
  • 1 Tank Pressure Test kit
  • Lots of 3/32 cleco's (not pictured) 

Thursday, November 5, 2009

Left Tank Baffle/Leading Edge Attach Drilling

I match drilled the tank to the outer leading edge using a #30 pilot.  There is a strip of aluminum between the tank (left side of pic) and leading edge (Right side of pic) that connects the two together.  Eventually these holes get widened to a #19 to accept the tank attach screws.  The tank rests perfectly on the Z-Brackets and with clecos through the spar into the nutplates, it holds the assembly down tight.  With the tank snug up against the leading edge and the aluminum strip underneath, I used the pre-punched holes as a guide and drilled away.  The copper color clecos in the photo are in the holes drilled by this step.


If you remember a few posts ago I talked about Dan Checkoway's method for drilling the Z-Brackets.  Here is where it comes into play.  I drilled and cleco'd the root end rib to the Z-Bracket.  Using a #30 drill.  Using Cleco's in every hole ensures no movement as I move to the next step.  The outer holes first to center the tank, since they are prepunched.




With the tank secured to the root Z bracket and spar, I then removed the leading edge which exposes the outward most Z-Bracket for drilling.  The leading edge will be deburred, dimpled, primed and riveted before it goes on the wing again.






A cleco in every hole on the outer Z Bracket secures the baffle, then the tank skin and inner ribs can be removed exposing the baffle perfectly located for using the prepunched holes to drill all the remaining Z Brackets.   Use a drill stop here to protect the spar.


Wednesday, November 4, 2009

Airplane Part or Modern Art?

These are the finished polished and deburred Tank Attach Angles.  Looks pretty cool, and later on you will see where they go.  I might do a bit more work on them before attaching, but for the most part we are done here.  The key is to make sure there are no sharp edges anywhere.  Either from the original angle, or from the bandsaw etc..  The scotchbrite wheel got lots of use here as well as a sanding drum on the dremel tool.  Worked out well and no scratches or rough spots to be seen.


Tuesday, November 3, 2009

Tank Attach Angles

Back in the shop after a great trip down to Arizona..  Was fun to hang out with the family for Halloween.  Now back to business though.   I started working on the tank attach angles because it is a fairly independent project and can be picked up easily after being out of the shop for a while.  Going back to drilling the baffle to the Z brackets is going to take more thought and I will probably get to that this weekend.

The Tank Attach Angles require a lot of metal work.  Basically you take a piece of angle, and cut it up with the bandsaw per the plans and come out with something that really has no sharp edges.  the pics below show the first few steps.



In the image below you can see what the final product is going to look like.  This piece butts up against the leading edge tip of the tank and connects to the Fuselage when the wings are attached.   Its a pretty heavy and thick piece of angle.


Thursday, October 29, 2009

Root Z Brackets installed

After Several Challenges and lots of Stress and Frustration.   Oh and even some Difficulty, the Root Z Brackets are now installed on both wings.  This piece of work shouldn't have been such a hassle but it was for us.  A combination of things contributed to the challenge almost like making this a perfect storm, but we got it done.   I had to borrow a solid 1 inch flat rivet set from a friend which ended up working great, then the bucking bar underneath was difficult to work around the spar and the spar web from between the ribs.  I am not super happy with the results either since the bucking bar nicked the spar web...   I have already confirmed with the Van's Forums that Bekah and I have no issues here.  Bucking the underside of those rivets was a pain, but we got it done and now the Z Bracket is in place and ready to support the Tank.


Places we have been in our RV-7 ! (Blue 2013, Yellow 2014, Green 2015, Purple 2016, Red 2017)