Search This Blog

Monday, January 31, 2011

Firewall Gusset final riveting

I was only able to get about 1/2 hour in tonight, but it was enough to power through the firewall gussets.  These guys were easily squeezed with the 3.5 inch yoke, then the 4 inch flat nose yoke for the last two in each far corner.  Turned out well, for tomorrow onto more stuff.  Like finishing up the top J Channel and adding the rear top skin. You can see in the pic below I have done some work on one of the J Channels.  Tomorrow hopefully I will be able to continue to press on.

No comments:

Post a Comment

Places we have been in our RV-7 ! (Blue 2013, Yellow 2014, Green 2015, Purple 2016, Red 2017)