Fuse Odds and Ends

I ordered my fuel pump and my fuel selector..  I went with the new boost pump from EFII, and the Andair Fuel selector.  Very excited for these items to arrive.   (If you click on these links, use your back button to return to this page)

The EFII pump is brand new and should be a real winner, plus it is made in America..  (just like the rest of my airplane)..   I am a bit nervous because there is no previous install examples to choose from..  So this is truly going to be experimental, but that is why I am here I guess.   I look forward to the challenge.   I will go into some good detail on how I do it and hopefully it will be useful for others down the road.  Most likely I will be leveraging what others have done with various fuel pump installations.  Not completely unknown territory.

After these orders I started working on some of the fuel selector panel and other front panels.   My  next big step is a major priming/painting section, then get moving on the seats and flaps etc..  Looking forward to sitting in the plane..

Also, after taking longer than I thought I was able to cut and tap the Flap push-rods..  Sometimes steps take much longer than they should..  This was one of them...  But I am past it now..  The blue tape is to keep the lock washer in place since they won't be connected to the flaps for many moons..

Sunday, February 20, 2011

Flap Mechanism

I am working a bit out of order and should really get those seats riveted in before going too much further.  I am hesitating because I think I might go with a two tone interior color.  I am thinking about putting in a lighter color in the seat area including F705 and F704 supports that go up the sides of the fuse.   Once I figure this out I will take care of the seats..  In the meantime I focused on the flap mechanism that needs to be done anyway.  Its kind of exciting because I get to work with some parts other than just sheet metal..


First off the plans have you fabricate a bunch of parts then test fit the white flap tube (weldment).  I don't have pics of everything, but are showing the main pieces involved.  The electric flap motor sits in a channel that sits right between the two seats and moves the flap extension up and down which moves the end extensions that connect to push rods through the bottom of the fuse and attach to the flaps.

A few points to note is that you should make sure to check the bag that has the flap motor in it first because it contains parts that are further along than you might think.   I missed this step and fabricated many of the parts from raw scrap metals.  They all turned out great but would have been easier to use some of the precut ones.

Also,  it takes a lot of finesse to get things to fit great in this section.  Looking forward through the entire flap mechanism is important because the plans have you drill and install items early on that could impact things later in the build process.  I think I got lucky in a few spots and it turned out great..  For example the middle UMHC block.  I chose to center the holes on the baggage ribs...  It let the block hang over a bit, but turns out it fits very smoothly against the support where I have noticed other planes have gaps between the two.

So all in all it went together well, even though it will need to be taken apart to get the seats down for good.

There was one big boo-boo that I made..   I grabbed the #12 bit vs the #19 bit when I drilled the top of the rear vertical support.   You can see the two alternate color cleco's below..  The gold one is in the larger hole that I drilled by error..  To fix this and keep symmetry I will probably drill both them to the larger hole and use a AN3 bolt and an associated nutplate here.  No harm no foul, will just be stronger.  (and a bit heavier.)


Friday, February 18, 2011

Tunnel Cover

I don't want to say this tunnel cover came out perfect... but.. its pretty darn good.   I am getting much better at the fine details of working with this aluminum stuff.  Drilling exact located holes without the bit wandering, using various tools to cut complex angles etc..  I know this cover is not perfect, but I am happy how it turned out so far.   Of course there is lots more to do with this little piece of metal that could get screwed up before I can call it completely finished..

Wednesday, February 16, 2011

Seat Back Supports and trying to understand the tunnel cover.

I am not working in exact order per the plans, but need to do some priming and top coat of the seats before I can rivet them into place.  So to keep progress moving along I worked on the seat back supports.  These guys go behind and adjust the angle of the seat backs depending on which hinge you have the seat back secured to.  It sounds confusing, but is really quite ingenious..  I used the fly cutter to cut the lightening holes, and standard drilling techniques to affix the hinge have to the seat back support..  Came out well..



Then I started troubleshooting the angles that support the tunnel cover.  These guys are Z type angles like used on the tank supports, but as you can see from the blue hashed lines, they need very complex cuts during the fabrication process.  I haven't figured out how I am going to do this, probably a combo of die grinder and band-saw...

Tuesday, February 15, 2011

Arm rests and seat floors

Tonight I went through and reinforced the arm rests.  Many people have issues with these bending over time under weight as people adjust themselves in the seats.  While passengers will always be told these aren't designed to support body weight, I still am taking the extra time to reinforce them.  I had some left over floor support angles that I mis-drilled..  These babies worked perfect under the armrest for some additional strength.    The photos are a bit over exposed but hopefully you get the picture.


I also finished drilling the hinges to the seats that hold the seat backs..  These were quite a challenge and I wouldn't recommend using the Van's provided measurements.   The holes, if measured exact conflict with the flanges of the seat floor ribs.  Others have had problems on the aft hinge where the holes are to close to the seat rib rivet.  Take your time on this step, and look at it from all angles.  



Monday, February 14, 2011

Front Baggage Side cover.. Tie down Storage

I didn't spend much time in the shop tonight, just enough to prep the front baggage side covers..   I also followed the recommendation in the plans and tapped an aluminum block to rivet in and hold the tie down rings when not in use.  It turned out pretty nice and will be a great spot to hold these guys while I am flying.  These will be primed and painted next time I have enough parts ready.

Sunday, February 13, 2011

Baggage floors and F-706 bulkhead (3 posts in one ! )

I got through tons of work on the plane this weekend and really should have posted a few times..  I was much more excited about continuing to move forward than to put together some posts on this blog, so I will put it all down here and hopefully not miss anything..   As you can tell from the pictures I was able to finish the baggage floors and 706 corrugated bulkhead.  This really brought the rear cabin in to shape and it looks great..

The biggest issue I had to deal with was that my rear baggage side panels weren't drilled correctly.  The holes along the top were off by about 1/4 hole..  So to keep moving forward I just enlarged the holes and used larger rivets that I already had.  It doesn't look bad at all and since they were cherry-max rivets, it is definitely structurally sound, even stronger than the plans ask for.

There was so much work I don't even know where to start..  I trimmed the top of the rear baggage bulkhead so that it would fit, then I was able to measure out a 1 inch gap to the top skin..  This is different than what the plans say to do, but it makes it turn out very nice with a smooth contour that follows the skin nicely.  Also on the bulkhead I created the seat belt wear blocks that allow the cable to slip through the bulkhead.  These required lots of measuring and a bit of metal work.  I need to finish the metal prep before I can rivet these wear blocks for good.

I also was able to initially install the static system in the rear fuse..  No pics of this for now since the bulkhead is in place, but I will have some future pictures where it is visible.

Finally, the rear baggage seats are final riveted.  It really  makes the plane look bigger and "finished" with these in place..  I also place the peddles in temporarily to see how cool they looked..   ;-)  I can't wait to get to the seats and then for the first time sit in the plane with Bekah..  That should be in a couple weeks..  






Places we have been in our RV-7 ! (Blue 2013, Yellow 2014, Green 2015, Purple 2016, Red 2017)