First off the right tank passed pressure testing with flying colors. Here are some photos of the set up. For those using the upgrade fuel caps, a balloon with the lip cut off over the cap is the only way to go. Fully seals the cap for testing.
Here is my pressure testing set up.. I just tested this one on the wing, worked well.
Also, I was able to get a jump start on the Aileron Stiffeners tonight, all 32 of them.. wow, lots of deburring, but stuff I have seen before and in the scheme of things, really simple at this point. I should be able to finish these by tomorrow or so. All stiffeners cut, 5 deburred, only 27 to go.
Last but not least, Bekah was able to donate about 1/2 hour to riveting the top skin on the right wing. No pics yet as it is still a work in progress, but it is going well. ;-)