Not much progress this week. Bekah has been a bit busy so haven't been able to rivet on the nutplates for the root Z-bracket. This pretty much stops any additional progress at this point. I have been able to set the tank on the left wing which gives a full wing view on the stand which is great. Also the alignment of the tank to the leading edge is really great without any modification. Can't wait to start drilling the tank to the Z-brackets and moving forward.


This site shows the years of construction, first flights, and the continued adventures of Chad and Bekah in our RV-7
Search This Blog
Wednesday, October 28, 2009
Sunday, October 25, 2009
Left Fuel Tank
I was able to start working on the left fuel tank but decided that I needed more clecos before starting the right, so will be ordering some from Van's shortly. Also, I am going to be going to Arizona for Halloween, so the bog entries and work will slow down a bit for the next week or so. I will probably get another session in before shutting down for the holiday but we will see. Bekah and I will probably rivet the nutplates to the spar for the root Z-Bracket. We tried today and had some big challenges, I need to borrow a non swivel flush rivet set to get the rivets in the corners, the swivel set just doesn't cut it here.
If you are building, consider putting these nutplates on when you prep the main spar. Sure wish I new then what I know now. I might go back and update a blog entry so that others who read this have the option of looking forward on this one. (Note: if you put the nutplates on you will need to drill the Root Z-bracket to the spar first)
So the left tank started with final deburring and fluting of the ribs, just like before. These ribs don't get primed because they will be inside the tank. I did end up cutting the tank stiffeners for both tanks and smoothed them all up. These guys go between the ribs on the bottom of the tank so that the skin doesn't sag due to weight of fuel., Here is a pic of them cut up.

I read other web sites and determined that for the first assembly of the tank it was easier to start it outside of the leading edge jig and get a few clecos in place. I worked the upper and lower leading edge of the tank as everything began to take shape.
Most people know that the tanks on aircraft are in the wings, but few know that the tanks ARE the wings. Basically this section of the leading edge gets sealed up with a sealant, and is the tank. Pretty cool and effective..

If you are building, consider putting these nutplates on when you prep the main spar. Sure wish I new then what I know now. I might go back and update a blog entry so that others who read this have the option of looking forward on this one. (Note: if you put the nutplates on you will need to drill the Root Z-bracket to the spar first)
So the left tank started with final deburring and fluting of the ribs, just like before. These ribs don't get primed because they will be inside the tank. I did end up cutting the tank stiffeners for both tanks and smoothed them all up. These guys go between the ribs on the bottom of the tank so that the skin doesn't sag due to weight of fuel., Here is a pic of them cut up.
I read other web sites and determined that for the first assembly of the tank it was easier to start it outside of the leading edge jig and get a few clecos in place. I worked the upper and lower leading edge of the tank as everything began to take shape.
Most people know that the tanks on aircraft are in the wings, but few know that the tanks ARE the wings. Basically this section of the leading edge gets sealed up with a sealant, and is the tank. Pretty cool and effective..
Saturday, October 24, 2009
Z Brackets
Almost finished with the Z Brackets. Both Wing's brackets are now primed and the nutplates are installed on the 6 inboard brackets. I have temporarily mounted them so that I can mount the tank and back drill the surface of the Bracket.
The Root Bracket is bolted from the other side so the nutplates are attached to the spar. Here I have countersunk the rivet holes that hold the nutplates on. These guys are going to be a bugger to rivet, Bekah will need to shoot from the top and I will need to buck from within the ribs.. I think this is something that could have been done when the Spar was being prepared.. Note sure why the directions have you do it now.. If I were to do it again I would look to get these nutplates on when there weren't any ribs in the way. (Note: if you decide to put the nutplates on earlier in the process, you will need to drill the "root" Z-bracket first.) Also, some builders hold off on riveting the last couple root main ribs to allow for easier access at this stage.
Thursday, October 22, 2009
Z - Brackets
For those who need to know: Z brackets are used behind the tank to attach it to the main spar. The tank is bolted rather than riveted so that it can be removed if necessary.
Like everything it takes longer than you think; probably 8-10 hours to work through 14 brackets for both wings. My process basically is to use the offset #12 hole and a scrap nut/bolt to mount the bracket to the Spar per the plans (some brackets face different directions). Ensure the bracket is 90 Degrees, then use the pre-drilled spar as a guide to drill the other two holes in the bracket. I use my 90 degree drill attachment because it is much easier to ensure that I am drilling exactly perpendicular to the spar. This makes the holes as perfectly round as possible. The AN3 Bolt fits into a #12 drilled hole perfect if it is drilled well. Almost creating a friction fit even without the nut. Anyway, after the 2nd hole is drilled I drop in a bolt just to make sure the 3rd hole is drilled perfect relative to the first two. Here are some pics:



Like everything it takes longer than you think; probably 8-10 hours to work through 14 brackets for both wings. My process basically is to use the offset #12 hole and a scrap nut/bolt to mount the bracket to the Spar per the plans (some brackets face different directions). Ensure the bracket is 90 Degrees, then use the pre-drilled spar as a guide to drill the other two holes in the bracket. I use my 90 degree drill attachment because it is much easier to ensure that I am drilling exactly perpendicular to the spar. This makes the holes as perfectly round as possible. The AN3 Bolt fits into a #12 drilled hole perfect if it is drilled well. Almost creating a friction fit even without the nut. Anyway, after the 2nd hole is drilled I drop in a bolt just to make sure the 3rd hole is drilled perfect relative to the first two. Here are some pics:
After the holes are drilled, trying to get the nut plates on is also a challenge. To keep the nutplate as centered as possible I use a scrap bolt and nutplate as a jig and use my drill press to ensure the hole is straight. A non perpendicular hole will allow the nutplate to shift when riveting and possibly offset the nutplate to the drilled bolt hole. Perfectly drilled holes are Awesome and Important ! (Am I a dork or what) ;-)
Once the nutplate holes are drilled and countersunk, its off to prep and prime before mounting the nutplates, then mounting to the spar. (These will only be temporarily mounted to the spar and will need to come off for tank final assembly.)
Side note: I have also finished match drilling both wings top and bottom as well as leading edges ! Wahoo.. Now its time to focus completely on the Tanks.. These guys will be a challenge and take some time but I look forward to it.
Tuesday, October 20, 2009
Wing Match-Drilling and Z-Brackets
Finishing up the drilling of both left and right main skins. Getting closer, but no pictures since it looks like what I have posted before.
I am also starting to look at the Fuel Tank Z Brackets and am trying to figure these out. Lots of information here on the web and lots of different methods to work through this process. I think here I will look at the plans/manual and get familiar, but do it a bit differently as others have done.
Dan Checkoway was one of the first guys to put up a site/blog of an RV-7 construction. He did an amazing job and had some great tips and tricks. I followed his site through the late 90's as he was working on and finishing his plane and was amazed at what it took to put an RV together.
Dan, pulled his site due to personal reasons and I think the fame he got in the home built community became a bit intrusive, so I miss the opportunity to review it as I go. He had posted a way to work the Z brackets that others have followed with great success. Without his site I will kind of "wing" it from what I remember and from what others have posted and will try to go through it step by step for future builders.. Brad Oliver does a great job as well as other builder's sites I point to on my home page at showing this process.
There are 7 brackets per wing/tank 6 standard and one Root bracket. The "root" brackets are the same but treated a bit differently and we will get to that.. First you have to place a pilot hole in the Z brackets where they attach to the main spar. This hole is #12 and is centered lengthwise on a flange, but offset from center 1/16th inch toward the web on the 6 standard brackets. On the Root bracket, this hole is centered lengthwise too, but offset 1/16th inch away from the web.
The offset towards the web allows for better clearance from your rivet puller when attaching the 6 standard brackets to the tank with the blind rivets. On the Root flange, the offset away allows for better wrench access when mounting the bracket.
To drill the pilot holes I set up a "jig" on the drill press to try and get the holes as centered and perfectly offset as possible.

All the pilot holes are drilled, now I need to use some scrap bolts to anchor them to the spar as I match drill the rest of the holes.
I am also starting to look at the Fuel Tank Z Brackets and am trying to figure these out. Lots of information here on the web and lots of different methods to work through this process. I think here I will look at the plans/manual and get familiar, but do it a bit differently as others have done.
Dan Checkoway was one of the first guys to put up a site/blog of an RV-7 construction. He did an amazing job and had some great tips and tricks. I followed his site through the late 90's as he was working on and finishing his plane and was amazed at what it took to put an RV together.
Dan, pulled his site due to personal reasons and I think the fame he got in the home built community became a bit intrusive, so I miss the opportunity to review it as I go. He had posted a way to work the Z brackets that others have followed with great success. Without his site I will kind of "wing" it from what I remember and from what others have posted and will try to go through it step by step for future builders.. Brad Oliver does a great job as well as other builder's sites I point to on my home page at showing this process.
There are 7 brackets per wing/tank 6 standard and one Root bracket. The "root" brackets are the same but treated a bit differently and we will get to that.. First you have to place a pilot hole in the Z brackets where they attach to the main spar. This hole is #12 and is centered lengthwise on a flange, but offset from center 1/16th inch toward the web on the 6 standard brackets. On the Root bracket, this hole is centered lengthwise too, but offset 1/16th inch away from the web.
The offset towards the web allows for better clearance from your rivet puller when attaching the 6 standard brackets to the tank with the blind rivets. On the Root flange, the offset away allows for better wrench access when mounting the bracket.
To drill the pilot holes I set up a "jig" on the drill press to try and get the holes as centered and perfectly offset as possible.
All the pilot holes are drilled, now I need to use some scrap bolts to anchor them to the spar as I match drill the rest of the holes.
Sunday, October 18, 2009
Pitot Mast
I went with the SafeAir1 Anodized aluminum pitot mast. It looks great and supports most pitot tubes. I will be using a heated pitot, but haven't settled on the final brand yet. This mast is definitely light in weight and the anodizing is good. I will put a coat of primer on it before it is fully installed.
(For those non pilots, the pitot mast holds the Pitot Tube which hangs out in the wind and measures the relative airspeed of the airplane. Pretty cool and necessary to fly. Its a french word and pronounced PeeToe.. ;-)
(For those non pilots, the pitot mast holds the Pitot Tube which hangs out in the wind and measures the relative airspeed of the airplane. Pretty cool and necessary to fly. Its a french word and pronounced PeeToe.. ;-)
You start by using the template just outside of the last access hole. On the 7 you need to work past a rib, and make sure that you center the rivet holes behind the template. This puts the inside edge of the pitot mount about 3/4 inch to the outside of the rib.
I used a combination of step drill and grinder to carefully cut the skin. Checking the mast all the time to make sure of a good fit.
Once the mast fit through the hole, I match drilled the holes through the spar and to the back of the tube from the template.
Note that only the rear two holes get countersunk because the three in the front fit behind the spar and it is the spar that will be countersunk.
Saturday, October 17, 2009
Right wing leading edge work
Today was kind of challenging as I installed the end rib in the leading edge and the flange that supports the tank when installed next to the leading edge.
You start by setting the end rib in place and making sure it is square with the end of the leading skin. (this turned out to make the rivet holes really close to the web on the leading edge. I wish I would have let the rib stick out just a bit so that the holes would be centered)
After the rib is in place you have to drill it from the bottom using the holes in the spar as a guide. Here I used a 12 inch bit and my right angle drill to make sure the rib was drilled straight. Worked well..
Once the bottom of the rib is clecod to the spar, you insert the flange between the rib and the skin and use the skin holes as a guide to drill the flange and the rib which don't come pre-drilled.
You have to make sure the rib stays flush with the outer edge of the skin and the flange stays straight per the measurements provided in the directions. This part is challenging because for some reason the whole assembly wants to keep moving on you. I got it done and was happy with my results, but I think this is one of those tasks that you can do better each time you end up doing it again. Like I said earlier I would have let the rib stick out about a 1/16th of an inch so that the holes would be more centered on the flange. In my case they ended up real close to the web, but I was still able to get my dimpler die in there, so I think we are OK.
Subscribe to:
Posts (Atom)