Thursday, September 10, 2009

Spar Work Continued

Continued with the countersinking and preparation of the spars. Primed the sides of the left spar that have been completed as shown in the picture. Looking good so far. Working on the right spar now.

Tuesday, September 8, 2009

Spar Prep

Today I continued working on attaching the spar nutplates and countersinking for the screws that hold on the tanks. There was a lot of metal that needed to come out so that the #8 screws will lay flat. I tested the countersink gauge depth with a sample aluminum sheet dimpled the same as the tank will be. Also, per other blogs and the RVator journal, the correct depth is .370 inch.. Using a digital caliper, I got each hole pretty exact. A lot of people make up special jigs to help ensure the countersink is centered and the hole concentric. I decided to try it the way Vans instructs in the manual and it turned out great. I used a number 30 countersink and with the pre-riveted nut plates, the countersink remained centered and concentric. All shavings were easily vacuumed out. Eventually I will prime the entire strip where the counter syncing took place but as you can probably see in the pictures that I did take a cotton swab dipped in primer and primed under the countersunk rivets holding the nutplates on.


I also countersunk and installed the nut plates for the cover plates for the access areas under the wing. These were countersunk a bit smaller to .312 inches for the #6 screws, and as well I double checked with dimpled aluminum to make sure of accuracy.

Sunday, September 6, 2009

Shop Prep / Starting the Spars




Today was a huge day of progress. I was able to get the shop 100% into Shape for the wings. and even got started on countersinking the spars to prep for the nut plates that hold on the tank.

First a few things around the shop. The wing jig is complete and I used wood from the crates to help strengthen and as well provide locations for storage of items up high. I didn't want to drill into the concrete so I used some RTV (all I had was high temp, but oh well) to seal the bottom of the posts to the concrete.. It dried pretty stout and I dont think I will have a problem cleaning it up when done.

Also, I used plywood to create a pocket for the skins on the garage wall. Works for now anyway. I was able to use almost all of the crate material around the shop, saving a bit of cash, but more importantly reducing having to get rid of the stuff.. At least for now.


Found some time in the middle of everything to prime all the plate nuts as well as the aileron counter weights. Used Rattle can, and was really no problem, but tons of plate nuts.


The big event for the day was actually starting the spar prep. I had to predrill, then machine countersink for the nut plate attach rivets. Using Electrician's tape keeps the shavings out of the spar and won't leave residue on the anodized surface like most other tape. I haven't countersinked for the #8 screws yet but will save that for tomorrow.

Saturday, September 5, 2009

Wing Inventory Day


Long weekend so we are hoping to get a lot done. Today we were able to inventory the entire wing kit and try to find a location for everything. There were tons of rivets, tons of ribs and a lot of Misc hardware. Did I say how pretty those spars are ?












Also started the wing jig and am going to build both at once so decided to use two separate supports so I can walk between the wings. Tomorrow I will build out quite a bit more on the jig and leverage the supports to hold some items up high getting them out of my way.


I used some of the crating material to make a shelf in the garage that will only hold light weight items, but perfect for the wing tips.. Also, some of the aileron/flap skins..



Thursday, September 3, 2009

Reserved 704CH

Bekah and I have settled on our N number and I reserved it with the FAA. This step gives more reality to the airplane and kind of gives it a name in a way...

"Experimental 704 Charlie Hotel" OR "RV 704 Charlie Hotel" Sounds even better don't you think?

!

Wednesday, September 2, 2009

Rudder/VS Tips Primed


After about 3-4 applications of microlight filler and sanding I decided to go ahead and prime the tip of the Rudder/VS. I think it turned out good enough for now, although there may have to be additional work at the time of final paint. Maybe even some additional work as I am wrapping up the project, but for now I am done and ready to reorganize the garage for the wings. This weekend will be the inventory and hopefully enough time to get started on the countersinking of the spars..


The pics show the final sanding job, and then the finished priming. I put two coats of primer on and hope I didn't get it too thick. The line between the primer and the aluminum is noticeable, hopefully it can be sanded down before final prime and paint.

Tuesday, September 1, 2009

Wings Are Here ! !

Yesterday my Wing Kit finally arrived. I met the FedEx guy and between the two of us we were able to get the two boxes into my garage. All went well, but my only concern was that the big box was standing up on its side. Vans didn't mark it very well if it was supposed to remain with the flat side up, so I accepted it and started tearing it apart. Everything looked well protected inside, so I don't think there was any issue.



I haven't inventoried it yet, but have taken a look at some of the parts. I was surprised that all there really is in the kit is Skins, Ribs, Spars, and misc parts.. But then I guess that is all that is really in a wing anyway. Oh, and two huge fiberglass tips.. So, to finish the final sanding on my Rudder/VS, then full focus to wings.. Good thing we have a long weekend coming our way. ;-)