Monday, September 21, 2009

Rear Spar and More Ribs

No pictures today but since I got more primer I was able to finish the right rear spar (Bekah's side). Now with both rear spars finished I am focusing on the wing ribs. The outboard nose ribs are all deburred, I need to finish the tank ribs tonight and hopefully start working on the corners of the main ribs. The next few days is all about ribs.


Oh, just to clarify I still need to work out the right tie-down/aileron attach bracket assembly. Was waiting for primer on this one and wanted to get more clarification on the torque settings. Should be done with that in the next day or so as well.

What the heck, I will attach a picture of the rear spars in the living room, and the scotchbright wheels after work on the ribs.. Just for something to look at..

Sunday, September 20, 2009

Ribs, Ribs, Ribs

Since I was out of primer, and needed something to work on I started on the ribs. It's going to take several sessions so I thought I would at least get started. Things went well but while deburring with the scotchbright wheel, I sure wish I wore a dust mask. My sinuses have been messed up ever since.



My huge articulating drill press came in handy for this step.. I turned it up to its highest speed and went to work. Deburring edges and lightening holes with ease. Actually once I got into the ribs, there were tons more than I expected, but I was able to get the edges deburred all in one sitting. I still need to finish up the insides of the bends with hand tools which will take for ever, but at least I got a start at it.



Here is an example of how I am working the leading edges. I got this tip from Brad's website which you can access from my home page, but using emery cloth like dental floss is working well on the nose ribs. There can't be any sharp edges anywhere.. Wow, lots of work to do.


.

Saturday, September 19, 2009

Left Rear Spar

On the rear spar tip reinforcement plate there are some areas that need to be machine countersunk, Some people modify their countersink to fit the area, I just used my deburing tool with the countersink bit in it. Drilled into wood to keep it from wandering and held the extension still to make a pretty nice countersink.



I also began priming the left rear but ran out of primer. I am using the Napa Rattle can primer for the spars anyway and really like the simplicity of it. Also, it seems to dry faster and stick better than the PPG stuff, but might weigh a bit more. The PPG stuff seemed to scratch pretty easily. I will probably go with a combination of primers on the wing but will remain consistent by section. Will end up with some pretty colors though. Gold main spar, grey rear spar, white ribs.. We'll see if I can get some other colors in there too.



The riveting went well as I used post-its and clecos to help make sure I leave the holes empty that are supposed to be riveted later. These holes remain open and get riveted in assembly with ribs and aileron attach brackets etc..



Below is the left rear spar complete and ready to start getting ribs attached..

Thursday, September 17, 2009

Rear Spar

To get a jump on things I started working on the rear spars. Mainly just doing some of the trimming that is required before really getting into it. I bought a new bandsaw and was able to test it out as I trimmed the excess off the fuselage attach point on the spar doublers. (love the bandsaw, wish I had it earlier - Craftsman 10 inch) This worked out well as I matched up the two doublers and match drilled it straight into scrap wood. Then used the bandsaw to cut through both at the same time. One thing I thought of after the fact is that I could have used the doubler as a template and traced the outline onto the other doubler before feeding it to the bandsaw. My measurements turned out pretty accurate, but this might have helped make it quicker.



After tracing the pushrod hole from the spar onto the aileron attach doubler, I used a step drill to punch out the holes in the doubler plate. I then put a grinder in the drill press on high speed and it shaped the hole up right away.




Here is one picture that I will be asking vans about. It seems both rear spar center doublers lean to the right when looking at them directly from the back. Not sure if this is a problem in manufacture, but I will contact Van's as well as talk to the guys on the forums. - UPDATE - From the forums, it seems this is no big deal, as long as hole/edge distance is satisfactory. I measured it up and each rivet hole is far enough from the edge. So looks good and onto priming and assembly..


Sunday, September 13, 2009

Tie Downs and Aileron Bellcrank Brackets

Continuing on the Spar I manufactured the Spacers, Match drilled all the holes and installed the Tie down/Bell Crank brackets on the left wing. This step ended up taking a long time due to all the fabrication necessary to make these parts fit.

I started by using a junker miter saw to cut the aluminum stock. It worked perfect but I did make sure to cut slowly here.


Drilling the lightening holes was a royal pain. Getting those things centered and securing the spacer was the most difficult. Once I started drilling with the Hole Saw it got HOT. Wood started smoking and I had to let it sit for a while a few times in the middle of the session to cool. I was able to get the holes drilled and all in all turned out well, but I would recommend a tough/sharp hole saw and lots of patience for this one.


Assembly and priming of the tie down was more complex than I thought. Lots of drilling, then back drilling, then countersinking and of course all the metal prep work that goes along with Priming. For these pieces I am using a rattle can as its quick and easy and has proven in the past to dry really hard.. I have no concerns about the quality of the rattle can primer on appropriately prepared metal.

The final assembly is complete on the left wing. Everything fit well and the spacers went into the spar pretty snug which is what I was looking for. I will get more pictures while the right one goes together, but I will be using a drilled hardwood block for a drill guide to make it even more accurate. The attached pics show the tie down with the threaded Eye Bolt installed and the other side of the spar where the Aileron Bellcrank brackets are installed.


Saturday, September 12, 2009

Spar Countersinking Finished

Today I was able to finish up the spar countersinking and I am happy how it turned out. I went over them again and again and verified the size of each countersink on both left and right spars. I ended up making them a bit larger than .370, once I verified the sample dimpled aluminum piece torqued down correctly. I am hoping that it turns out perfect when the tanks go on. Primed all the areas where the anodizing was removed and am now ready for the next step.
The countersinking took much longer than I expected, but I think it is a pretty key point and I wanted to make sure it was as perfect as I could get it.

Friday, September 11, 2009

Spar Work Continues

Continuing the spar work I put about 2 hours in yesterday working on the right spar. Almost finished with it but no pictures yet showing progress. I also was able to tap the tie down blocks with a 3/8 by 16" tap I piced up from Lowes. Worked well and the eye bolts fit in and out easily. Pictures will be up soon.